training and consultancy for AS 9100 Fundamentals Explained
Flexible and responsible controls for controlling sampling and testing. Schedules could be programmed into the process to instantly log samples and prompt normal point monitoring, ensuring every one of the required samples are taken and tested properly. Samples may also be taken manually to aid unscheduled sampling or personnel checking.ISO 27001 F